[3B04]The Progress of PRA for SHIKA NPS Unit 2(3)Development of Plant Risk Monitoring Tool During Shutdown State

*Junya Masuko2, Mutsuhiro Nakada1, Toshihiro Aida1, Daisuke Suimon1, Shinichi Hamayani2,1, Takayuki Negishi2, Atsuo Ikeda2 (1. Hokuriku Electric Power Company, 2. Nuclear Engineering and Services Company)

[3B05]The Progress of PRA for SHIKA NPS Unit 2(4)Evaluation Results of Spent Fuel Storage Pool PRA

*Shinichi Hamatani2,1, Mutsuhiro Nakada1, Toshihiro Aida1, Daisuke Suimon1, Takayuki Negishi2, Atsuo Ikeda2, Junya Masuko2 (1. Hokuriku Electric Power Co., 2. Nuclear Engineering and Services Co.)

[3B06]KK-6,7 project Internal Event Operating Level 1 PRA Model Sophistication Progress Report(5)Classification of Accident Sequence of LOCA inside PCV

*Shunsuke Tanno1, Shohei Yamagishi1, Ryota Tomiyasu1, Teruyoshi Sato1, Toshiteru Saito1, Masayuki Hiraide2, Toshinobu Kita2 (1. TEPCO SYSTEMS CORPORATION, 2. Tokyo Electric Power Company Holdings, Inc.)

[3B07]KK-6,7 project Internal Event Operating Level 1 PRA Model Sophistication Progress Report(6)Scope of LOCA outside PCV and internal flooding PRA

*Hiroaki Sonoyama1, Shohei Yamagishi1, Ryota Tomiyasu1, Shunsuke Tanno1, Teruyoshi Sato1, Toshiteru Saito1, Masayuki Hiraide2, Toshinobu Kita2 (1. TEPCO SYSTEMS CORPORATION, 2. Tokyo Electric Power Company Holdings, Inc.)

[3B08]Dynamic Risk Analysis on Multi-hazards of Seismic and Seismic-induced Internal Flooding in Nuclear Installation

*SUNGHYON JANG1, AKIRA YAMAGUCHI1 (1. The University of Tokyo)