Presentation Information

[CS8-03]Relationship between cross-sectional area and construction speed based on measurement data of trencher excavation

*Tetsuya Einaga1, Yuji Oobu1 (1. Civil Engineering Research Institute for Cold Region Public Works Research Institute)
PDF DownloadDownload PDF

Keywords:

removal of utility poles from roads,trenching machines,underground cable laying,Electric wire utility tunnel method,construction speed

Login required to view

Login is required to view some content.

Comment

To browse or post comments, you must log in.Log in