Presentation Information
[CS8-03]Relationship between cross-sectional area and construction speed based on measurement data of trencher excavation
*Tetsuya Einaga1, Yuji Oobu1 (1. Civil Engineering Research Institute for Cold Region Public Works Research Institute)
Keywords:
removal of utility poles from roads,trenching machines,underground cable laying,Electric wire utility tunnel method,construction speed
Comment
To browse or post comments, you must log in.Log in