Presentation Information

[VI-1051]Example of consideration for the construction of Takatayama Tunnel Phase 2 in the Hanwa Expressway 4-lane project(Part2)
~Rock classification in poor accretionary rock mass and Support structure design based on analytical methods~

*Takuya Yamamoto1, Syunichirou Takao1, Daiki Kumashiro1, Takahiro Sugiura2, Atsuyoshi Higashi2 (1. West Nippon Expressway Company Limited, 2. Dia Nippon Engineering Consultants Co., Ltd.)
PDF DownloadDownload PDF

Keywords:

Mountain tunnel,Accretionary prism,Second line,Finite element method,M-N failure envelope

Login required to view

Login is required to view some content.

Comment

To browse or post comments, you must log in.Log in