Presentation Information

[VI-29]Regarding the application of the design/construction lump-sum order system and basic contract as a measure against failure and failure to complete.

*yorio kato1 (1. Central Nippon Expressway Company Limited)
PDF DownloadDownload PDF

Keywords:

Measures against illness,Design/construction lump sum order method,Basic contract

Login required to view

Login is required to view some content.

Comment

To browse or post comments, you must log in.Log in