Presentation Information
[VI-605]A Construction Plan for Earth Retaining Wall of Cut and Cover Tunnel Under Restricted Conditions in Underground Continual Two-Level Crossing Project
*Yoshihide Kawahara1, Yutaka Kobayashi1, Takuji Shibuya1, Takeki Hirabayashi2, Keiichiro Ichihana2, Wataru Nakajima2 (1. SEIBU RAILWAY Co.,Ltd., 2. SHIMIZU CORPORATION)
Keywords:
Cut and Cover Tunnel,Earth Retaining Wall,Cutter Soil Mixing Construction Method,TMX Construction Method,Tone Boring Hole Construction Method,Construction Near the Track