Presentation Information

[VI-606]A Construction of Earth Retaining Wall of Cut and Cover Tunnel Using Core Material That Can Be Cut Inside the Track in Underground Continual Two-Level Crossing Project

Yutaka Kobayashi1, Takuji Shibuya1, Yoshihide Kawahara1, Takeki Hirabayashi2, Keiichiro Ichihana2, *Wataru Nakajima2 (1. SEIBU RAILWAY Co.,Ltd., 2. SHIMIZU CORPORATION)
PDF DownloadDownload PDF

Keywords:

Construction Near the Track,Construction in the Track,Tone Boring Hole Construction Method,Core Material That Can Be Cut,Chemical Grouting Method

Login required to view

Login is required to view some content.

Comment

To browse or post comments, you must log in.Log in