[VI-606]A Construction of Earth Retaining Wall of Cut and Cover Tunnel Using Core Material That Can Be Cut Inside the Track in Underground Continual Two-Level Crossing Project
Yutaka Kobayashi1, Takuji Shibuya1, Yoshihide Kawahara1, Takeki Hirabayashi2, Keiichiro Ichihana2, *Wataru Nakajima2 (1. SEIBU RAILWAY Co.,Ltd., 2. SHIMIZU CORPORATION)
Keywords:
Construction Near the Track,Construction in the Track,Tone Boring Hole Construction Method,Core Material That Can Be Cut,Chemical Grouting Method