Presentation Information

[VI-971]Investigation of actual situation and analysis of adjacent construction of shield tunnel cases (Part 2)

*Hitoshi Tajima1, Katsuo Takagi2, Tetsuya Aoyama3, Masayoshi Nakagawa4, Kiwamu Tsuno5 (1. IHI Infrastructure Systems Co.,Ltd., 2. Metro Development Co., Ltd., 3. SHIMIZU CORPORATION, 4. KAJIMA CORPORATION, 5. Railway Technical Research Institute)
PDF DownloadDownload PDF

Keywords:

shield tunnel,adjacent construction,case study,histogram analysis with cumulative relative frequency,predicted analysis value,measured value

Login required to view

Login is required to view some content.

Comment

To browse or post comments, you must log in.Log in