[VI-35]Trial calculation of repair cost reduction of road bridges based on preventive maintenance
*Mitsuyasu Iwanami1, Kadooka Seiji2, Yamasaki Tatsuya2, Ikeda Takuya2 (1. Tokyo Institute of Technology, 2. Sumitomo Mitsui Trust Bank, Limited)
[VI-36]Cost Analysis of Bridge Maintenance Record in Local Governments
*Seiji Kadoka1, Mitsuyasu Iwanami2, Takuya Ikeda1, Tatsuya Yamasaki1 (1. Sumitomo Mitsui Trust Bank, Limited, 2. Tokyo Institute of Technology)
[VI-37]Formulating Preventive Maintenance Strategies for Bridges using Distress Chain Diagram
*Tatsuya Yamasaki1, Mitsuyasu Iwanami2, Takuya Ikeda1, Seiji Kadooka1 (1. Sumitomo Mitsui Trust Bank, Limited, 2. Tokyo Institute of Technology)
[VI-38]A Study on Effective Preventive Maintenance based on Cost Analysis of Road Bridge Maintenance
*Takuya Ikeda1, Iwanami Mitsuyasu2, Seiji Kadooka1, Tatsuya Yamasaki1 (1. SUMITOMO MITSUI TRUST BANK, 2. Tokyo Institute of Technology)
[VI-39]Regarding the relationship between CM and the project promotion system of local governments that have construction projects
*syuichi moriyama moriyama1, yosuke fujita2 (1. CTI Engineering Co., Ltd., 2. Osaka City)
[VI-40]A study of innovation through the introduction of integrated Portfolio/Program/Project management into the construction industry
*Toshiki Shimoike1 (1. Asia Engineering Consultant Co., Ltd)
[VI-41]Construction plan and Result about Line Switching
*Yuki Sato1, Itaru Kato1 (1. East Japan Railway Company)
[VI-42]Railway alignment plan based on the future road plan for the reconstruction of the Tokaido Line Otanigawa Bridge and other.
*Tamon Noda1, Kosuke Konishi1 (1. Central Japan Railway Company)