施工計画 (3)

Thu. Sep 5, 2024 1:30 PM - 2:50 PM JST
Thu. Sep 5, 2024 4:30 AM - 5:50 AM UTC
B102(川内北キャンパス講義棟B棟)
Chair: Hokuto Kato

[VI-209]Real-Time Management of Lateral Pressure during Injectuing High-Fluidity Concrete

*Miyata Yoshikazu1, Hashimoto Gen2, Motoyama Hisashi1, Mizokami Kouhei1 (1. SHIMIZU CORPORATION, 2. PERI JAPAN)

[VI-210]long distance pumping of antiwashout under water concrete

*Koki Takahashi1, NORIYUKI MIYATA1 (1. TAISEI CORPORATION)

[VI-211]Construction of PC grout re-injection method in bridge repair work

*Yuki Takahashi1 (1. Senkenkogyo Co. Ltd.)

[VI-212]Measures for Ensuring and Improving Concrete Quality in PC Two-Span Continuous U-shaped Girder Bridge

*Yuki Koguchi1, Takaaki Ishida1, Takashi Nakamura1, Toshimi Ishimatsu1, Hayashi Hironobu1, Yutaro Miyaji1, Shuji Yanai1, Shuhei Kira2 (1. Kajima Corporation, 2. Kyushu Railway Company)

[VI-213]Day-straddling construction of water gate base concrete using super-delayed concrete

*Kazuki Aruga1, Kenta Sugawara1, Masanori Nakamura1, Yuuto Takahashi1, Tatsurou Hatanaka1, Shouta Ishikawa1, Kenji Hayakawa1 (1. TOKYU CONSTRUCTION CO.,LTD.)

[VI-214]Case Study of Mixture Changes of Underground Skeleton by Temperature Stress Analysis

*Ayaka Matsumiya1, Takeshi Ohtsuka1, Tomoko Ohtsuka1 (1. TAISEI CORPORATION)

[VI-215]Construction issues and countermeasures for the seismic reinforcement work in overcrowded bar arrangement

*Daiki Asakura1, Shinichi Hisamatsu1, Masanobu Odashima1, Manabu Aihara1, Hitoshi Kawamori1 (1. KONOIKE CONSTRUCTION CO.,LTD.)

[VI-216]Restoration design of existing slabs which have round bars with hooks

*Rieko Murakami1, Hisato Gomita1 (1. SHIMIZU CORPORATION)