地下構造物 (2)

Thu. Sep 5, 2024 11:10 AM - 12:30 PM JST
Thu. Sep 5, 2024 2:10 AM - 3:30 AM UTC
B200(川内北キャンパス講義棟B棟)
Chair: Mitsuo Kanazawa

[VI-315]Construction of the downward curved-pipe roof connecting the expressway tunnel and the ramp tunnel - the result of downward pipe roof -

*Jin Ota1, Ryota Yamamoto1, Ken Iwashita1, Ren Kameoka1 (1. TAISEI CORPORATION)

[VI-316]Achievements regarding connection structures between shield tunnels running both up and down

*Daiki Asahara1, Yasuhiro Asa1 (1. TAISEI CORPORATION)

[VI-317]Construction of connecting upper and lower existing tunnels using freezing method

*Naomichi Kiyama1, Daiki Asahara1, Yasuhiro Asa1 (1. TAISEI Corporation)

[VI-318]Introduction to safety measures for tunnel excavation work in methane gas-containing ground

*Shinichi Hirooka1, Katsuji Maeno1, Yoshiyuki Oshino1, Daigo Fujieda2, Ryohei Nabana2 (1. TAISEI Corporation, 2. Horonobe Underground Research Department)

[VI-319]Ventilation planning for deep shafts and tunnels using ventilation network analysis

*Takayoshi Sanda1, Katsuji Maeno1, Tetsu Sanoki2, Daigo Fujieda3, Ryohei Nabana3 (1. TAISEI CORPORATION, 2. GEOSCIENCE RESEARCH LABORATORY, 3. Japan Atomic Energy Horonobe Underground Research Center)

[VI-320]The reinforcement results of the basement structure which is narrow-mindedness

*Shogo Mikami1, Shigeki Tasaki1, Keita Kikuchi2 (1. MEDA Corporation, 2. Tohoku Electric Power Company)

[VI-321]Seismic reinforcement of the railway underground tunnel using post-installed high-strength shear reinforcement steel bars

*Ayana Miyazaki1, Hiroshi Orita2, Masayoshi Unno1, Yuki Nagatani1, Hiroaki Mikura1, Yugo Nishio1 (1. Obayashi Corporation, 2. Keio Corporation)

[VI-322]Achievements and Improvements in Seismic Retrofitting with Post-Installed Shear Reinforcement Method Using Ceramic Anchor

*Kaname Toyoda1, Kazutaka Nakagawa1, Jiro Okamoto1, Shinichi Yamanobe2, Takuya Iwamoto2 (1. Kajima Renovate Corporation, 2. Kajima Corporation)