Session Details
地下構造物 (3)
Thu. Sep 5, 2024 1:30 PM - 2:50 PM JST
Thu. Sep 5, 2024 4:30 AM - 5:50 AM UTC
Thu. Sep 5, 2024 4:30 AM - 5:50 AM UTC
B200(川内北キャンパス講義棟B棟)
Chair: Yasutaka Imanaka
[VI-323]Execution scheme of large scale open-cut excavation at construction of Chuo Shinkansen Kanagawa Prefecture Station (tentative)
*Taro Yoshikawa1, Hayamizu Yuzi1, Matsuno Yuta1, Yoshida Misaki1 (1. Central Japan Railway Co.)
[VI-324]Efforts of strengthen community collaboration at construction of Chuo Shinkansen Kanagawa Prefecture Station (tentative)
*Masato Tome1, Shimamura Yuka1, Higashi Kiyofumi1, Yoshikawa Taro1 (1. Central Japan Railway Company)
[VI-325]CONNECTION OF A SHAFT AND A SHIELD TUNNEL BY THE GROUND FREEZEING METHOD IN DEEP UNDERGROUND AND HIGH WATER PRESSURE
*Kazuyoshi Nomura1, Hiroyuki Shirai1, Hiroshi Kodera1, Kyouji Abe2 (1. TEPCO Power Grid, Incorporated, 2. HAZAMA ANDO CORPORATION)
[VI-326]Basic Trial Calculations for Proposed Buoyancy Countermeasures in Deep Shafts
*Yuzuki Ozawa1, Tetsuji Yamaguchi2, Motoi Iwanami1 (1. Waseda University, 2. Kumagai Gumi Co.,Ltd.)
[VI-327]Construction of a vertical shaft directly under the Tokaido Shinkansen track in an urban area
*Tomohiro Tsubosaka1, Hisashi Yamaguchi1, Toshiomi Murai2, Hirotaka Nakajima2 (1. HAZAMA ANDO CORPORATION, 2. Central Japan Railway Company)
[VI-328]Construction considerations and countermeasures for large-section, deep shaft construction
*DAISUKE MINAMIMOTO1, Kouichi Haze1, Katsushi Nakashima1 (1. TODA CORPORATION)
[VI-329]Investigation of reduction method of hanging girder temporary wall in large pneumatic caisson (Part 3)
*Takayuki Iwamoto1, Motoi Iwanami1, Shintaro Abe1, Tomokazu Namiki2, Tsutomu Yano3, Fumi Komoriya3 (1. Waseda University, 2. Oriental Shiraishi Corporation, 3. Itec Consultant Corporation)