Session Details

軌道保守 (1)

Thu. Sep 5, 2024 9:30 AM - 10:50 AM JST
Thu. Sep 5, 2024 12:30 AM - 1:50 AM UTC
C202(川内北キャンパス講義棟C棟)
Chair: tsuyoshi yamaguchi

[VI-671]Evaluation of the installation condition of diamond crossing with single slips in Osaka Station

*Ryo Masaki1, Masanobu Kusuda1, Kohei Umeno1 (1. West Japan Railway Company)

[VI-672]Development of methods for detecting areas of water stagnation in the track and countermeasures

*Takahiro Yamakawa1, Ryozi Yanagi1 (1. Central Japan Railway Companyompany)

[VI-673]Study of track maintenance methods for TC-type labor ballastless track

*Yuya Sugiyama1, Yosuke Tsubokawa1, Saito Daiki1, Naitou yuta2 (1. Railway Technical Research Institute, 2. East Japan Railway Company)

[VI-674]REPORT ON REPAIRING OF LONGITUDINAL LEVEL IRREGULARITY IN A TURNOUT USING SWIVELING FOURHEAD BALLAST TAMPING MACHINE

*Soichi Kobayashi1, Susumu Yamaguchi1, Daisuke Watanabe1 (1. JR East)

[VI-675]Study on Estimation Method of Rail Stress under Lateral Force

*Mitsuru Hosoda1, Riku Takayama1 (1. Railway Technical Research Institute)

[VI-676]Consideration of rail grinding support using eddy current testing

*Kazumi Ryuo1, Takuya Inoue2, Toshifumi Tanaka2, Masanobu Kusuda2 (1. Railway Track & Structures Technology, 2. West Japan Railway Company)

[VI-677]The Study on the Transition of Stress Generated in the Tongue Rail Before and After the Re-alignment of Track around the Large Turnout

*Yuta Horii1, Kazuya Miura1, Junta Arima1, Masuhisa Tanimoto2 (1. Tokyo Metro Co., Ltd., 2. Metro Sharyo Co., Ltd.)