Session Details

交通インフラマネジメント

Thu. Sep 5, 2024 3:10 PM - 4:30 PM JST
Thu. Sep 5, 2024 6:10 AM - 7:30 AM UTC
C402(川内北キャンパス講義棟C棟)
Chair: Seiji Iwakura

[IV-58]Report on cross-sectional widening study results for tunnel evacuation connecting shaft

*Hajime Egawa1 (1. East Nippon Expressway Company Limited)

[IV-59]utilization for slope preventive maintenance using risk assessment

*Kunikazu Saito1, masanori satake2, kazuyuki nagao3 (1. East Nippon Expressway, 2. Nexco-Engineering Tohoku, 3. Dia Nippon Engineering Consultants)

[IV-60]Proposal for a repair policy formulation model that takes into account the characteristics of the concession system

*Toshiko Abe1, Kotaro Sasai1, Kiyoyuki Kaito1, Seiji Kawai2 (1. Osaka University, 2. INFRONEER Holdings Inc.)

[IV-61]Using Deep Learning to Predict the Occurrence of Slope Failures Due to Heavy Rainfall and the Number of Days for Road Recovery

*Kaoru Takayama1, Naotsugu Sato2 (1. CHUO University, 2. CHUO Universuty)

[IV-62]Analysis and Reflections of the Recovery of Infrastructure Performance of Shinkansen After Large Scale Earthquake

*Kotoha Hatakeyama1, Keita Uemura1, Yoshikazu Takahashi1 (1. Kyoto University)

[IV-63]Comparison of impact disasters considering freight traffic volume of third sector railways of the parallel conventional railway

*Haruto Kitayama1, Naotsugu Sato1 (1. CHUO University)

[IV-64]Trends in weather observation data when trains are stopped for long periods due to snowstorms

*Yusuke Nakanishi1, Kazushiro Endo1 (1. Hokkaido Railway Company)