[VI-886]Shortening the engineering project by erecting large-diameter deep foundation piles in bulk with reinforcing bar cages
*Masayoshi Harada1 (1. KAJIMA CORPORATION)
[VI-887]Construction of steel pipe sheet pile using water jet press-in method and loading test
*Takafumi Totsuka1 (1. TAISEI CORPORATION)
[VI-888]Improved efficiency of shield tunnel construction with automatic material transfer system and tunnel interior stockyard
*Susumu Sato1, Kimihito Mukouyama2, Rie Kumano2, Atsushi Tanaka1, Jun Itou1, Kazuo Yoneda1 (1. TAISEI CORPORATION, 2. TOKYO METROPOLITAN GOVERNMENT)
[VI-889]Increasing profitability of belt conveyors and environmental improvements using short-length conveyor belts
*Masasuke Iwayoshi1, Katsuya Amamoto1, Akane Matsuda1 (1. Maeda Corporation)
[VI-890]Regarding the plan and construction for the removal of Higashi-Kanto Expressway Shihongi Daiichi Bridge
*Kiyohiro Nakada1, Ryuta Kimura1, Shogo Tamura1 (1. Taisei Construction Co., Ltd.)
[VI-891]Construction issues and examples of countermeasures in establishment of bridge unseating prevention system
*Kenta Teranishi1, Junpei Morishita2, Yoshinori Nishijima1, Takashi Midorikawa1, Tatsuya Torikoshi1 (1. Central Nippon Highway Engineering Nagoya Company Limited , 2. Central Nippon Expressway Company Limited)
[VI-892]Provisional bridge improve large scale height limit open cut method efficiency
*Kazumi Koda1, Yukiko Sumi1, Akira Hamano1 (1. TAISEI CORPORATION)
[VI-893]Shortening the construction period for constructing a box conduit with wing walls
*Hokuto Kato1, Gen Shioda1, Atsushi Ogawa1, Taichi Noro1 (1. TODA CORPORATION)