[VI-992]Application results of fully mechanized AGF steel pipe casting system and labor-saving system for chemical injection.

*Teruhiro Fukushima1, Yasunari Tezuka1, Daisuke Onoduka1, Hiroaki Yonehana1, Yuta Imatomi2, Takahiro Masuda2 (1. KAJIMA CORPORATION, 2. YOKOHAMA MINATOMIRAI RAILWAY COMPANY)

[VI-993]Automation of 2 boom rock bolt installation machine

*Takaaki Inuzuka1, Takashi Miura1, Shogo Arai1 (1. Kajima corporation)

[VI-994]Development of a Rotary Concrete Placing System for a High-speed Automatic Lining Construction System for Large Cross-sections

*Yuto Matsura1, Manabu Yamashita2, Sho Yamamoto1, Ryo Kaminaka1 (1. SHIMIZU CORPORATION, 2. West Nippon Expressway Company)

[VI-995]Development of Tunnel Muck Rock Size Determination System Using AI Object Detection Technology

*Ryo Wakatake1, Yoshitomo Tatsumi1, Yasuhito Tsujikawa1 (1. Toda Corporation)

[VI-996]Development of automatic excavation and remote operation system for free section excavator

*Koya Soejima1, Keita Kato1, Yosuke Matsuo2 (1. HAZAMA ANDO CORPORATION, 2. MITSUI MIIKE MACHINERY COMPANY, LIMITED)

[VI-997]On-site use of the piping switching device "T-Slide Valve" for ordinary concrete

*Daichi Habashita1, Masato Shimono1, Eizi Huziki1, Syota Hiyama1, Ryouichi Ueoka2, Kaisho Koga2, Tatsuya Usui2 (1. TAISEI CORPORETION, 2. Taisei Corporation Technology Center)

[VI-998]Improvement and Work System Reform of 3D Crack Analysis System in Mountain Tunnel Face

*Norihisa Nakahara1, Noda Naoto1, Muraoka Ami1, Funahasi Takahito1, Sushida Fujio1, Iguchi Shigenobu2, Matumoto Hiroki2 (1. TEKKEN CORPORATION, 2. CalTa Inc.)

[VI-999]The Introduction of Supply Chain Management for Tunnel Construction Site

*Kazuaki Sakane1, Kota Ogura1, Atsushi Tanegashima2, Sosuke Fujimoto2 (1. FUJIMORI SANGYO CO.,LTD., 2. Himeno Gumi Co.,LTD)