Session Details

山岳トンネル(覆工・吹付)(4)

Fri. Sep 6, 2024 11:10 AM - 12:30 PM JST
Fri. Sep 6, 2024 2:10 AM - 3:30 AM UTC
B202(川内北キャンパス講義棟B棟)
Chair: Yasuo Ide

[VI-1066]Improving productivity of tunnel lining with Tunnel RemOS -Lining

*Mitsuki Hanko1, Yukihiro Nishida1, Hiroyuki Satou1, Yoshiki Nakai1, Satoru Yamamoto1 (1. Nishimatsu Construction)

[VI-1067]Effect of anti-adhesive material applied to
construction joints of tunnel lining

*Kenji Akiyoshi1, Tomonori Miyagi2, Tomoyuki Seki3, Nobuyasu Todoroki3, Hideaki Nishiura1, Kuniaki Sakurai1, Takahiro Irie1 (1. OBAYASHI Corporation, 2. SAITAMA Prefecture, 3. DAI NIPPON TORYO CO.,LTD)

[VI-1068]Shortening the construction period of large-section, short-distance tunnel construction

*Takahiro Tanaka1, Shimogaki Hiroyuki1 (1. MAEDA CORPORATION)

[VI-1069]Improvement of the Quality of tunnel lining by Applying High-performance Curing Agent

*Takehiro Sakai1, keiichirou naitou1, hirosi kobayasi2, hiroyuki kobayasi2 (1. kajima corporation, 2. nagano prefecture)

[VI-1070]A study on the effect of invert excavation on tunnel structure

*Kouhei Sawada1, Isamu Ohtsuka1 (1. Taisei Corporation)

[VI-1071]Optimization of lining concrete placement through experiments using full-scale mock formwork

*Takaki Hashimoto1, Hirotomo Hirakata1, Jyo Yamane1, Ryota Tendo1 (1. HAZAMA ANDO CORPORATION)

[VI-1072]Full-scale experiment on construction of automatic casting considering height of lining concrete measured by concrete pressure

*RYUTARO MATSUMOTO Matsumoto1, Saito Tkahiro1, Gokitani Naoko1, Rajib Kmar Biswas1 (1. Okumura Corporation)

[VI-1073]Measures against flaking of lining concrete joints using chamfering strip with uneven surface

*Yoshitomo Tatsumi1, Ichiro Sekine1, Ryou Wakatake1, Riku Okita1, Yuukou Sugitani1 (1. TODA CORPORATION)