Session Details

リニューアル (7)

Fri. Sep 6, 2024 11:10 AM - 12:30 PM JST
Fri. Sep 6, 2024 2:10 AM - 3:30 AM UTC
C102(川内北キャンパス講義棟C棟)
Chair: Yoshinori Kano

[VI-1193]Effect of Construction Errors in Headed Studs on Removal of Composite Steel Girder Concrete Bridge Decks

*Honoka Ishikawa1, Takahisa Shigematsu2, Yu Okuhiro3 (1. IDEA Consultants, Inc., 2. National Institute of Technology (KOSEN), Kure College, 3. KYOKUTO KOWA CORPORATION)

[VI-1194]Construction test of the precast pc slabs joined using the longitudinal mechanical joints

*Yusuke Takagi1, Shu Kobayashi1, Kazuya Saito2, Minoru Tanaka1, Hiroshi Michiwaki3 (1. IHI Construction Service Co., Ltd., 2. IHI Corporation, 3. NejiLaw inc.)

[VI-1195]Development of cutting and removal method of composite box girder slab using plate jack

*Shohei Ito1, Yasuhiko Sato1, Sho Motoyama1, Takesi Suzuki1 (1. NISHIMATSU CONSTRUCTION)

[VI-1196]Structural study of temporary service area at construction joints of floor slab replacement work

*Genjiro Tanikawa1, Sato Kanta1 (1. TODA CORPORATION)

[VI-1197]Matters to be considered in the design of integrated construction of floor slabs and guard fense

*Kanta Sato1, Xiao Chen1, Yueqi Wang1 (1. Toda Corporation)

[VI-1198]Considered Items of Temporary Assembly at Manufacturing Factory as for Constructing Bridge Deck and Wall Handrail Integrally

*Xiao Chen1, Yueqi Wang1, Kanta Sato1, Katsunori Shimazu1 (1. Toda Corporation)

[VI-1199]Considerations for on-site installation in the integrated installation of deck slab and wall fences

*WANG YUEQI1, Yoshita Soichirou1, Sato Kanta1, Chen Xiao1 (1. TODA Corporation)