新設および大規模改修時における橋梁計画 (7)

Fri. Sep 6, 2024 10:40 AM - 12:00 PM JST
Fri. Sep 6, 2024 1:40 AM - 3:00 AM UTC
文学部第一講義室(川内南キャンパス中講義棟)
Chair: Nobuhiro Niwa

[CS3-40]Bridge construction with consideration for maintenance and management~Bridge appendages in continuous viaduct sections~

*Yuichi Nakamura1, Shunsuke Oikawa1, Yumemi Taniguchi1, Kohei Nasukawa1, Natsuki Sakai1 (1. East Nippon Expressway Company Limited)

[CS3-41]Planning example of a bridge with a small curve radius (R=50m) focusing on bearings

*Rena Yabuuchi1, Masumi Kuriyama1, Katsushi Kadota1 (1. CHUO FUKKEN CONSULTANTS CO.,LTD.)

[CS3-42]Consideration of Span-by-span Erection for Newly Constructed Bridges in Expansion Construction Project

*Yusuke Bando1, Tomomi Okabe1, Hitoshi Unosawa1 (1. East Nippon Expressway Company Limited)

[CS3-43]In the Sendai Northern Road 4-lane project between Rifu Shirakashidai IC and Tomiya JCT Format study of Ishizumori viaduct

*Masaki Ishizawa1 (1. East Nippon Expressway Company Limited)

[CS3-44]Bridge design considering a four-lane project of Joban Expressway

*Hitoshi Unosawa1, Sirou Suzuki1, Masayuki Usui2 (1. East Nippon Expressway Company Limited, 2. CTI Engineering Co., Ltd.)

[CS3-45]City Planning Road Numazu-Minamiissiki Line -Design of Bridge Over a Tumulus-

*Yoko Kabaki1 (1. Eight-Japan Engineering Consultants Inc.)

[CS3-46]The future of bridge planning
- From the perspective of optimizing materials and structures –

*YASUSHI Kamihigashi1 (1. Central Nippon Expressway Company Limited)