Presentation Information
[11AM2-Qe-04]Study on the Evaluation Method for the Integrity of Primary Waterstop Rubber at Immersed Tunnel Element Joints
*Sho Nakamizo2, Wataru Iwai1 (1. Metropolitan Expressway Company Limited, 2. Shutoko Technology Center)
Keywords:
Tunnel,Box joint,Stagnant water,Water stop rubber
Login required to view
Comment
To browse or post comments, you must log in.Log in
