Presentation Information

[11AM2-Qe-04]Study on the Evaluation Method for the Integrity of Primary Waterstop Rubber at Immersed Tunnel Element Joints

*Sho Nakamizo2, Wataru Iwai1 (1. Metropolitan Expressway Company Limited, 2. Shutoko Technology Center)

Keywords:

Tunnel,Box joint,Stagnant water,Water stop rubber