Presentation Information

[11PM1-Zo-13]Construction of pile work directly under the special high-voltage line (275kV) using digital twins.

*Manabu Terasawa1 (1. oobayashigumi)

Keywords:

Special high voltage line,Pile driver,Digital Twin,Modeling