Presentation Information

[CS19-23]Nagano Expressway Design and construction of Nakasone River Bridge Slab replacement

*Michiru Masuda1, Katsuhiko Hirano2, yuji Iwase1 (1. Kawada Construction Corporation, 2. East Nippon Expressway Corporation)

Keywords:

Width direction division replacement method,Streamlined joints,Wall railing integrated type,Mobile special gate type erection machine