Presentation Information
[VI-01]A temporary cofferdam designed to reduce river cross-sectional obstruction and improve construction efficiency
*Takashi Yanao1, Kazutaka Taguti1 (1. TAISEI CORPORATION)
Keywords:
River deadline method,River connection construction,deadline structure,Process shortening,Water stop property,Reduced obstruction of river cross section