Presentation Information
[VI-1281]Report on adjacent construction of Otaru City waterworks facilities directly under the river in a small soil-covered area
*Yota Hikichi1 (1. tokyu construction)
Keywords:
tunnnel,small soil-covered area,under the river,Close construction,Suppression of ground surface subsidence,Excavation support method