Presentation Information
[VI-172]Examination of the efficiency of the examination for tunnel normal whole with the high-resolution image acquisition system
*Shin Sugawara Sugawara1 (1. Fukken Engineering Co., Ltd.)
Keywords:
Tunnel image analysis,Crazing analysis,Tunnel structure,Examination for normal whole