[VI-252]Construction of multiple sharp curves and shallow cover of less than 1D using the earth pressure balance (EPB) shield method (2)— Construction of sharp curves with a radius of 15 m or less at four locations —
*Koshiro Takimoto1, Hiroto Motonaga1, Atsushi Satou1, Ryoki Nakaie1 (1. Okumura Corporation)
Keywords:
Shield,Sharp curve,Over-excavation,Alignment accuracy