Presentation Information
[VI-514]Development of a new construction method and PCL panels with integrated side walls for the renewal of tunnel lining(1/2)
*Takeshi Suzuki1, Otani Tatsuhiko1, Mito Kenji1, Fujihara Shinya2 (1. NISHIMATSU CONSTRUCTION Co.,Ltd., 2. GEOSTR Corporation)
Keywords:
Lining restoration work,the renewal of tunnel lining,PCL method,Frame Structure Analysis,limit state design
Login required to view
Comment
To browse or post comments, you must log in.Log in
