Presentation Information
[VI-515]Development of a new construction method and PCLpanels with integrated side walls for the renewal oftunnel lining(2/2)
*Tatsuhiko Otani1, Suzuki Takeshi1, Nishida Hiroyuki2, Naito Yasufumi3 (1. NISHIMATSU CONSTRUCTION CO.,LTD., 2. NIHON-SAMICON CO.,LTD., 3. IHI CONSTRUCTION MATERIALS Co.,Ltd.)
Keywords:
Lining restoration work,the renewal of tunnel lining,PCL method,Forklift,Carring and installation equipment