Presentation Information
[VI-616]Construction of a large-diameter NATM tunnel directly beneath a national highway and a power station approach road
*Hiroyuki Takahashi1, Takagi Masamitsu1, Hiromatsu Naoto1, Itakura Tooru1, Sou Fumiharu1, Sakuma Akira2 (1. AokiAsunaro, 2. KokudokoutsusyouKinkichihouseibikyoku)
Keywords:
Preventing tunnel surface subsidence,Tunnel support method,Early closure of tunnel section,AGF construction,Small soil-covered tunnel