Presentation Information

[VI-803]Development of excavation soil volume measurement and management system for mud pressure shield construction (part 2: validation experiment)

*Takuto Nakayama1, Hirofumi Tanaka1, Kouki Hongo1, Takaya Koga1 (1. Toda Corporation)

Keywords:

shield tunneling method,excavated soil volume,water content ratio,belt conveyor,real-time measurement