Presentation Information

[VI-990]Prior removal of rock masses that would impede shield tunneling based on geological survey results -Hokkaido Shinkansen, Yotei Tunnel (Hirafu Site)-

*Ryota Kobe1, Shigeru Uematsu1, Masashi Negoro2 (1. Japan Railway Construction, Transport and Technology Agency, 2. Okumura Corporation)

Keywords:

SENS,NATM,BG Method,elastic wave velocity,resistivity,debris avalanche depostis