Session Details
施工・維持管理計画(2)
Thu. Sep 11, 2025 4:20 PM - 5:40 PM JST
Thu. Sep 11, 2025 7:20 AM - 8:40 AM UTC
Thu. Sep 11, 2025 7:20 AM - 8:40 AM UTC
3F C1
[IV-42]Analysis of the results of the first and second periodic inspections of road bridges
*Tatsushi Kajio1 (1. Kyushu Road Maintenance, Center Kyushu Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism)
[IV-43]Measurement management and performance in the removal of a truss-type pedestrian bridge made of rails
*Satoshi Ozawa1, Hideshi Sirakawa1 (1. East Japan Railway Company)
[IV-44]Study on the impact of replacement concrete construction in the near area of the tunnel portal.
*Kosei Yamagishi1, Yusuke Miyano1, Naoki Ikushima1, Hideaki Mikami1 (1. TODA CORPORATION)
[IV-45]Installation of concrete columns of ramen viaduct by crane vibrator
*Junetsu Yamada1, Takafumi Kataoka1 (1. Asunaro Aoki Construction Co)
[IV-46]Pre-loading method for high embankments and its implementation measures
*Hiroki Takei1, Kosei Yamagishi1, Naoki Ikushima1, Hideaki Mikami1 (1. TODA CORPORATION)
[IV-47]Estimation of the Mechanism of Railway Embankment Collapse Due to Rainfall and External Inflow Water
*Yusuke Aoki1, Takuto Shinkai1 (1. East Japan Railway Company)