Session Details
トンネル⑤
Thu. Sep 11, 2025 4:20 PM - 5:40 PM JST
Thu. Sep 11, 2025 7:20 AM - 8:40 AM UTC
Thu. Sep 11, 2025 7:20 AM - 8:40 AM UTC
3F D2
[III-175]FUNDAMENTAL STUDY OF MICROTREMOR ARRAY SURVEY ON A MOUNTAIN TUNNEL
( PART 1: CHAIN ARRAY SURVEY )
*Yuka Ota1, Yasuyuki Hodotsuka1 (1. Sumitomo Mitsui Construction Co. Ltd.)
[III-176]FUNDAMENTAL STUDY OF MICROTREMOR ARRAY SURVEY ON A MOUNTAIN TUNNEL
( PART 2: GEOLOGICAL PREDICTION AHEAD OF THE TUNNEL FACE )
*Yasuyuki Hodotsuka1, Yuka Ota1 (1. Sumitomo Mitsui Construction Co., Ltd.)
[III-177]Predicting the tunnel seepage and groundwater level by inverse analysis for two dimensional flow
*Shuji Morita1, Yasumasa Sotokoba2 (1. Hydro Technology Institute Co., Ltd, 2. OKUMURA CORPORATIN)
[III-178]A consideration on critical strain used as a hazard warning levels in tunnel excavation
*Daisuke Ishikawa1, Yuki Wakabayashi1, Yoshitsugu Takekoshi2, Naoki Tachibana2 (1. Japan Railway Construction, Transport and Technology Agency, 2. CHUO FUKKEN CONSULTANTS CO.,LTD.)
[III-179]Study on Management Methods for Subgrade Heaving in the Kuyama Tunnel
*Yutaro Takagishi1, Takeshi Manago2 (1. KYUSHU RAILWAY COMPANY, 2. Japan Railway Construction Transport and Technology Agency)
[III-180]Development of inverse analysis technology for measuring stress of steel support
*Shohei Nagata1, Ken Itagaki1 (1. TAISEI CORPORATION)
[III-181]Basic study on design method focusing on gable wall of rectangular shaft
*Satoshi Kanemaki1, Atsushi Teshigawara1, Nozomu Taniguchi2 (1. Fukken Engineering Co.,Ltd, 2. Nihon University)