Session Details
斜面⑤
Thu. Sep 11, 2025 4:20 PM - 5:40 PM JST
Thu. Sep 11, 2025 7:20 AM - 8:40 AM UTC
Thu. Sep 11, 2025 7:20 AM - 8:40 AM UTC
3F E2
[III-246]Case study of thermal infrared imaging survey of mortar-sprayed slopes and consideration of the applicability
*Tomomi Tanoue1, Mitsuru Yamazaki1, Kazuo Kamata1 (1. Central Nippon Highway Engineering Nagoya Company Limited)
[III-247]Simple performance confirmation test for ground anchors
*Masuo Kondo1, Takahiro Hasegawa1, Toshiaki Mabuchi1, Toshinori Sakai2 (1. Public Works Research Institute, 2. Mie University)
[III-248]Performance verification test of ground anchor jump-out protection device
*Takahiro Hasegawa1,3, Masuo Kondoh1, Toshinori Sakai2, Toshiyuki Takanashi3, Masaharu Tsujimoto3 (1. Public Works Research Institute, 2. Mie University, 3. Kawasaki Geological Engineering Co.,Ltd)
[III-249]Evaluation of residual tensile load obtained by lift-off test
*Toshinori Sakai1, MASUO KONDOH2, TAKAHIRO HASEGAWA2, EIJI YAMASHITA3, TOSHIYUKI TAKANASHI3, MASAHARU TSUJIMOTO3, KOUZI TAGUCHI3, TOYOKAZU HIGASHI3 (1. Mie University, 2. Public Works Research Institute, 3. Society of SAAM)
[III-250]Example of Increase prediction of ground anchor tensile load based on load cell measurement of landslide slope
*Mitsuru Yamazaki1, Jingyi Ren1, Shinya Ueno2 (1. Central Nippon Highway Engineering Nagoya Co., Ltd., 2. Central Nippon Expressway Co., Ltd.)
[III-251]Case study of ground anchors that may become over-tensioned after installation: Part 1 - Planning
*Tsuyoshi Ishii1, Tatsuya Nagumo2 (1. Japan Conservation Engineers&Co.,Ltd., 2. Kowa Company, Ltd.)
[III-252]Case study of ground anchors that may become over-tensioned after installation, Part 2 - Installation
*Tatsuya Nagumo1, Tsuyoshi Ishii2 (1. Kowa Company,Ltd., 2. Japan Conservation Engineers&Co.,Ltd.)