[VI-09]Improvement of technical issues and their countermeasures in the steel pipe sheet pile foundation construction
*Taiji Ota1 (1. TAISEI CORPORATION)
[VI-10]Mass Concrete Countermeasure Technology and Control Results Using Multi-System Pipe Cooling with Automatic Water Temperature Control Function
*Haruna Komiyama1, Akiyoshi Dai1, Shunji Watanabe1, Takashi Shimokawa1, Tatsuki Fukuda2, Tsutomu Kamiya2 (1. Sumitomo Mitsui Construction Co., Ltd., 2. Shizuoka Prefecture)
[VI-11]Shortening construction schedule by using precast gateposts in new lock construction
*Yoshiho Ueno1, Hiroyuki Kido1 (1. TAISEI CORPORATION)
[VI-12]Precasting the gate operation platform for new lock construction
*Rikuto Karino1, kido hiroyuki1, yabe kazushi1 (1. taisei coporation)
[VI-13]Construction of new lock gates during flood season
*Kazushi Yabe1, Hiroyuki Kido1, Yoshiho Ueno1, Taiga Hirose1 (1. TAISEI CORPORATION)
[VI-14]Shortening the construction period and improving workability by designing a catch basin using precast materials
*Hiroki Kitamoto1, Hitoshi Imai2, Souichiro Yoshida2 (1. TODA CORPORATION HIROSHIMA BRANCH, 2. TODA CORPORATION HEAD OFFICE)
[VI-15]Construction of a water intake tower using a passage pier
*Yoshihiro Nishie1, Shinichirou Aikawa1, Shinya Ogawa1 (1. Toda Corporation)
[VI-16]Structural modification of connection wells considering construction
*Shinya Ogawa1, Shinichirou Aikawa1, Yoshihiro Nishie1 (1. toda corporation)