Session Details

河川・水路構造物(2)

Thu. Sep 11, 2025 11:10 AM - 12:30 PM JST
Thu. Sep 11, 2025 2:10 AM - 3:30 AM UTC
C202

[VI-09]Improvement of technical issues and their countermeasures in the steel pipe sheet pile foundation construction

*Taiji Ota1 (1. TAISEI CORPORATION)

[VI-10]Mass Concrete Countermeasure Technology and Control Results Using Multi-System Pipe Cooling with Automatic Water Temperature Control Function

*Haruna Komiyama1, Akiyoshi Dai1, Shunji Watanabe1, Takashi Shimokawa1, Tatsuki Fukuda2, Tsutomu Kamiya2 (1. Sumitomo Mitsui Construction Co., Ltd., 2. Shizuoka Prefecture)

[VI-11]Shortening construction schedule by using precast gateposts in new lock construction

*Yoshiho Ueno1, Hiroyuki Kido1 (1. TAISEI CORPORATION)

[VI-12]Precasting the gate operation platform for new lock construction

*Rikuto Karino1, kido hiroyuki1, yabe kazushi1 (1. taisei coporation)

[VI-13]Construction of new lock gates during flood season

*Kazushi Yabe1, Hiroyuki Kido1, Yoshiho Ueno1, Taiga Hirose1 (1. TAISEI CORPORATION)

[VI-14]Shortening the construction period and improving workability by designing a catch basin using precast materials

*Hiroki Kitamoto1, Hitoshi Imai2, Souichiro Yoshida2 (1. TODA CORPORATION HIROSHIMA BRANCH, 2. TODA CORPORATION HEAD OFFICE)

[VI-15]Construction of a water intake tower using a passage pier

*Yoshihiro Nishie1, Shinichirou Aikawa1, Shinya Ogawa1 (1. Toda Corporation)

[VI-16]Structural modification of connection wells considering construction

*Shinya Ogawa1, Shinichirou Aikawa1, Yoshihiro Nishie1 (1. toda corporation)