施工計画(5)
Thu. Sep 11, 2025 4:50 PM - 6:10 PM JST
Thu. Sep 11, 2025 7:50 AM - 9:10 AM UTC
Thu. Sep 11, 2025 7:50 AM - 9:10 AM UTC
D201
[VI-104]Construction record of small jacking pipe launched from inside a small-section tunnel
*Yukihisa Miyaguchi1, Masahiro Akamatsu1, Taisei Sakai2, Makoto Kajihara2 (1. TAISEI CORPORATION, 2. TEPCO Power Grid, Incorporated)
[VI-105]Improving the workability on the starting-side bearing wall and the reaching-side strut beam using the roof&culvert method
*Keita Yokoyama1 (1. DAITETSU KOGYO CO.,LTD.)
[VI-106]Points to note in pipe-in pipe construction methods and improvement of construction efficiency
*Masaki Kuroda1 (1. MAEDA Corporation)
[VI-107]Restoration work for damaged hydroelectric power plant headrace tunnel
*Hiroki Kurosaki1 (1. Kumagai Gumi Co.,Ltd.)
[VI-108]Ensuring architectural constraints in tunnel lining repair work.
*Takashi Mimbuta1, Shikoda Yoichi (1. SENKEN KOGYO CO.,LTD.)
[VI-109]Optimization of Design Support Patterns by Survey Boring of Faults in Mountain Tunnels
*Takafumi Toyama1, Takada Noritsugi2 (1. TAISEI CORPORATION, 2. Ministry of Land, Infrastructure, Transport and Tourism)
[VI-110]Development of a Transportation Interference Verification Program adopting 3D Simulation for Onshore Wind Farm Construction
*Tetsushi Suminaga1, Hirokazu Yamaguchi1 (1. Obayashi Corporation)
[VI-111]Forest Road widening plan for windmill transportation
*yosinobu yasuda1, akiyoshi tanzawa1, tomoki ootsuji1 (1. Todakensetsu)