Session Details

橋梁(1)

Thu. Sep 11, 2025 9:30 AM - 10:50 AM JST
Thu. Sep 11, 2025 12:30 AM - 1:50 AM UTC
212

[VI-375]A Study on Monitoring of the Constrution of Long-Span Concrete Arch Bridge

*Takehiro Hirayama1, Keigo Tamano1, Hiroo Minami1, Ayumi Akiyama2, Asako Sakamoto2, Masatoshi Tobari1 (1. KAJIMA Corporation, 2. Central Nippon Expressway Company Limited)

[VI-376]Application of laser system to suspension bridge hanger rope substrate preparation

*Kazuki Nishikawa1, Tokumitsu Kishi2, Masato Komuro2, Masato Ishikawa3, Yoshio Akashi4, Hiroshi Takeda1 (1. Tokyo Densetsu Service Co.,Ltd, 2. Muroran Institute of Technology, 3. Docon Co.,Ltd, 4. Honshi-Expressway Bridge Engineering Co.,Ltd)

[VI-377]Examples of ICT equipment use in bridge superstructures

*Yoshiki Mori1, Hideo Ono1, Seiji Takahashi1, Kaito Kitamura1 (1. Oriental Shiraishi Corporation)

[VI-378]A report on full-scale PC grout testing

*Carlos Arturo Linan Panting1, Yoshiura Nobuaki1, Konishi Takahiro1, Toyabe Kanae1 (1. Shimizu Corporation)

[VI-379]Reinforcement design for dismantling the superstructure of a PC box girder bridge with deteriorated PC steel

*Masaru Fujishiro1, Teruo KURIYAMA1, Takeshi HASUNO1, Atsushi KUROKAWA1, Fumiyoshi KAWASAKI1, Takashi WATANABE2 (1. KAJIMA CORPORATION, 2. Ministry of Land, Infrastructure, Transport and Tourism)

[VI-380]Behavior measurement during dismantling of the cantilever of a PC box girder bridge

*Teruo Kuriyama1, Masaru Fujishiro1, Takeshi Hasuno1, Atsushi Kurokawa1, Fumiyoshi Kawasaki1, Takashi Watanabe2 (1. KAJIMA CORPORATION, 2. Ministry of Land, Infrastructure, Transport and Tourism)

[VI-381]Construction report on removing the superstructure of a PC box girder bridge using erection girders.

*Fumiyoshi Kawasaki1, Takeshi Hasuno1, Atsushi Kurokawa1, Masaru Fujishiro1, Teruo Kuriyama1, Takashi Watanabe2 (1. KAJIMA CORPORATION, 2. Ministry of Land, Infrastructure, Transport and Tourism)