[VI-382]Construction of Diagonal Stay Cables in Trussed Cantilever Erection of Long-Span Concrete Arch Bridge
*Yusuke Ariyama1, Masatoshi Tobari1, Hiro minami1, Ayumi Akiyama2, Asako Sakamoto2 (1. KAJIMA CORPORATION, 2. Central Nippon Expressway Company Limited)
[VI-383]Construction of precast steel-concrete composite floor slab for the Ushiku Viaduct on the Ken-O Expressway
*Yukimi Kimura1, Yuki Hagihara2, Kenichi Urai2 (1. Yokogawa Bridge Corp., 2. East Nippon Expressway Company Limited)
[VI-384]Construction of widened ribbed floor slabs at Shin-Meishin Expressway UJITAWARA Second Viaduct
*Takuya Abe1, Takeshi Yuge1, Taichi Nomoto2, Ryoma Taguchi2 (1. TAISEI CORPORATION, 2. West Nippon Expressway Company Limited)
[VI-385]The post-tensioning sequence for a PC box girder bridge with unbalanced spans - The Komatsukaminosawa Bridge on the Ban-Etsu Expressway-
*Eisuke Mizokami1, Takayuki iwaki1, Takahumi Nakada1, Takahiro Murakami1, Takashi Sato2, Yusuke Nishiyama2 (1. OBAYASHI CORPORATION, 2. Central Nippon Expressway Company Limited)
[VI-386]Construction report on the installation of simple pre-beam composite girders
*Katsuhiro Homma1, Shinsuke Fujii1, Daisuke Naitou1, Kakuya Suzuki1 (1. OKUMURA CORPORATION)
[VI-387]Demonstration Test with Full-Scale Equipment for Launching a Truss Bridge on a Curve
*Takumi Kanao1, Nobuyuki Hattori1, Yusuke Kikuchi1 (1. TEKKEN CORPORATION)
[VI-388]Design and construction plan for arch bridge over dam lake (Part 1)
*Seiji Yamamori1, yasukazu matuda1 (1. Eight japan engineering Consultants)
[VI-389]Design and construction plan for arch bridge over dam lake (part 2)
*Yasukazu Matsuda1, Seiji Yamamori1 (1. Eight-Japan Engineering Consultants Inc)