Session Details

橋梁(3)

Thu. Sep 11, 2025 1:30 PM - 2:50 PM JST
Thu. Sep 11, 2025 4:30 AM - 5:50 AM UTC
212
Chair: Yusuke Sakata

[VI-390]A Study on the Shear Buckling Behavior of Web Plates in I-Section Steel Girders with Rib Reinforcement on the Bottom Flange

Takumi Hosaka1, *Yu Koike1, Kaoru Kobayashi1, Yoshinori Takaku1, Takahiro Ishii1 (1. JR East Consultants Company)
Comment()

[VI-391]Closure record of an irregular balanced arch bridge

*Mitsuaki Kuwata1, Masahiro Abe1, Naoya Mizokami2 (1. KAJIMA CORPORATION, 2. West Nippon Expressway Company Limited)
Comment()

[VI-392]Report on repair work using high strength bolt friction joints with adhesive

*Satoshi Futaba1, Hitoshi Wada1, KInya Nakatsu1, Makoto Terai1, Masato Tanaka2, Eri Kose2, Takashi Yamaguchi3, Lingbo Yao3 (1. TAKADAKIKO Co.,Ltd., 2. Hanshin Expressway Co., Ltd., 3. Osaka Municipal University Graduate School)
Comment()

[VI-393]Study on the temporary fixed structure of the Akashigawa Bridge which is to be erected with a large unbalance moment on the expressway

*Kenji Nagao1, Youji Yamada1, Shoya Iida2, Shinya Maehara2, Masanobu Uno3, Tomonori Horii4 (1. Taisei Corporation, 2. West Nippon Expressway Co., Ltd., 3. VSL JAPAN Corporation, 4. Kobelco Wire Co., Ltd.)
Comment()

[VI-394]Construction of a Prestressed Concrete Bridge with a Temporary Pylon in the Composite Cable-stayed Bridge Construction of the Higashi-Ohgishima Mizue-cho Line in Kawasaki Port Road

*Hideaki Irikura1, Kenta Inaba1, Seiji Kawagishi1, Yoshinori Nitou1, Kazunari Ooishi1, Shunsuke Nakajima1, Kouichi Hirakiguchi1, Satoshi Usui2, Masaki Ueda2, Yuusuke Takei2, Chihiro Yokoyama2, Sunao Okamoto2 (1. KAJIMA CORPORATION, 2. TOA CORPORATION)
Comment()

[VI-395]Application of Melan construction method on multi-span continuous RC arch bridge (Part 1: Planning)

*Akira Takahashi1, Taiki Fukuda1, Koji Tanabe1, Kousuke Ito2, Yuzuru Tanaka2, Takahide Mori2 (1. West Nippon Expressway Company Limited, 2. KAJIMA CORPORATION)
Comment()

[VI-396]Application of Melan construction method on multi-span continuous RC arch bridge (Part 2: Construction)

*Ryota Kanehara1, Naoki Arai1, Daisuke Fukuda1, Kenji Eguchi2, Yukihiko Morita2, Ryota Soma2, Tatsuhiko Aoyama2 (1. West Nippon Expresway Company, 2. KAJIMA CORPORATION)
Comment()