Session Details

橋梁(5)

Thu. Sep 11, 2025 4:50 PM - 6:10 PM JST
Thu. Sep 11, 2025 7:50 AM - 9:10 AM UTC
212

[VI-404]Introduction of construction methods to shorten the process of replacing deck on Anogawa Bridge

*Yoshiyasu Furuya1, KENTA OKADA1, UTSUGI KAZUHIRO2, SEIYA OKAZAKI3, HIROKI MATSUDA3 (1. East Nippon Expressway Company Limited, 2. KAJIMA CORPORATION, 3. Nexco Engineering Niigata Company Limited)

[VI-405]Issues in replacing composite girder slabs

*Kanata Nakasako1, Okajima Tooru1, Kadowaki Kei1, Tanabe Hiroyuki1 (1. OKUMURA COPORATION)

[VI-406]Reuse of Precast Barrier Walls in Replacement of Deck Slab Work

*Masato Fukunaga1, Masatomi Kimura1, Norio Teduka2 (1. Shimizu Corporation, 2. Central Nippon Expressway Co., Ltd.)

[VI-407]Methods of Removing an Overbridge and Using 4D Simulation for Management

*Yujiro Nogishi1, kunihiro itaya1, yamato inaba2, yohei yuki2, shinichi sakamoto3, masato koujin3 (1. KAWADA CONSTRUCTION Company Limited, 2. Central Nippon Expressway Company Limited, 3. Toyama City)

[VI-408]Consideration of simultaneous removal of base asphalt pavement and concrete floor slabs.

*Kazuki Yoshimoto1, Seiya Hirao2, Masafumi Yoneda2 (1. Surface Technology Co., Ltd., 2. Nagoya Expressway Public Corporation)

[VI-409]Regarding the integrated repair of the base layer and the top surface of the floor slab using the WJ chipping method on the Nagoya Expressway Manba Line

*Seiya Hirao1, Masafumi Yoneda1, Kazuki Yoshimoto (1. Nagoya Expressway Public Corporation)

[VI-410]Use of the "Bearing replacement method using wire saws" in bearing replacement work

*Uchida Kazuki1, Kimiharu Nakamura2 (1. fujigiken, 2. nihontettou)

[VI-411]Relocation of a Braced Rib Tied Arch Bridge in the Nakabashi Replacement Project

*Uichiro Nishikawa1, Masami Ootani1, Katsutoshi Yamamoto1, Daichi Kaminaga4, Masanori Kumakura3, Masahiro Takahashi2 (1. TOMOE CORPORATION, 2. Fukisawa Consultants Co.,Ltd., 3. TOCHIGI PREFECTURAL GOVERNMENT, 4. TOKO BRIDGE CO.,LTD.)