Session Details
リニューアル(4)
Thu. Sep 11, 2025 9:30 AM - 10:50 AM JST
Thu. Sep 11, 2025 12:30 AM - 1:50 AM UTC
Thu. Sep 11, 2025 12:30 AM - 1:50 AM UTC
222
[VI-489]Replacement of severely damaged existing PC bridge wall railing with precast wall railing
*Yohei Terashima1, Takayuki Tominaga1, Satoshi Shirai1, Takahiro Asano2, Sera Yuki2 (1. OBAYASHI CORPORATION , 2. West Nippon Expressway Company Limited)
[VI-490]Construction Achievements of Width-Direction Division Replacement Using Smart Deck Renewal (SDR) System
*Masaharu Yamasaki1, Makoto Kajitani1, Satoshi Kusunoki1, Koichi Hirata1, Yuji shirakawa1, Yamaya Kensuke1 (1. Kajima Corporation)
[VI-491]Replacement of Deck slab using Ultra High Strength Fiber Reinforced Concrete at Kayanobashi Bridge
*Kunihiro Oshima1, Masahumi Ogawa2, Takashi Sakurai2, Osamu Hashimoto1 (1. TAISEI CORPORATION, 2. YOSHIKAWA CONSTRUCTION)
[VI-492]Application results of smart deck renewal system that enables rapid construction
*Ichiro Fukuda1, Kazuhiro Utsugi1, Hiromichi Kobayashi1, Masatsugu Nakanishi1, Masaki Sadayama1, Akihito Hayabusa1, Takashi Kameda1, Kenta Okada2 (1. Kajima corporation, 2. East Nippon Expressway Company Limited)
[VI-493]Case Study of Deck Replacement that Adhered to Schedules while Mitigating Congestion Caused by Traffic Regulations
- Deck Replacement Project of Mimurosawa-Bashi Bridge on Kanetsu Expressway -
*Akira Sato1, Yuichi Matsui1, Takahiro Kameyama2, Atsuya Tanaka2 (1. TAISEI CORPORATION, 2. East Nippon Expressway Company Limited)
[VI-494]Rapid construction of invert using U-shaped retaining wall on an in-service expressway
*Naoki Sakai1, Yutaka Ogawa1, Sakai Junki1, Ryuichi Okada1, Ginpei Kanda1 (1. SUMITOMO MITSUI CONSTRUCTION CO.,LTD.)
[VI-495]Construction Report on Deck Replacement Using Half-Section Method While Maintaining Existing Lanes (Part 1) - Tohoku Expressway Adatara River Bridge Deck Replacement Project -
*Hiroaki Endo1, Katsyuyuki Miura1, Wataru Miyamoto1, Yoshihiro Kurakawa2, Ryuta Kitaguchi2, Kousuke Yamamoto2 (1. East Nippon Expressway Company Limited, 2. Penta-Ocean Construction Company Limited)
[VI-496]Construction Report on Deck Replacement Using Half-Section Method While Maintaining Existing Lanes (Part 2) -Tohoku Expressway Adatara River Bridge Deck Replacement Project-
*Yoshihiro Kurakawa1, Yoshifumi Ejiri1, Gen Hayashi1, Katsuyuki Miura2, Hiroaki Endo2, Wataru Miyamoto2 (1. PENTA-OCEAN CONSTRUCTION CO., LTD., 2. East Nippon Expressway Company Limited)