[VI-489]Replacement of severely damaged existing PC bridge wall railing with precast wall railing

*Yohei Terashima1, Takayuki Tominaga1, Satoshi Shirai1, Takahiro Asano2, Sera Yuki2 (1. OBAYASHI CORPORATION , 2. West Nippon Expressway Company Limited)

[VI-490]Construction Achievements of Width-Direction Division Replacement Using Smart Deck Renewal (SDR) System

*Masaharu Yamasaki1, Makoto Kajitani1, Satoshi Kusunoki1, Koichi Hirata1, Yuji shirakawa1, Yamaya Kensuke1 (1. Kajima Corporation)

[VI-491]Replacement of Deck slab using Ultra High Strength Fiber Reinforced Concrete at Kayanobashi Bridge

*Kunihiro Oshima1, Masahumi Ogawa2, Takashi Sakurai2, Osamu Hashimoto1 (1. TAISEI CORPORATION, 2. YOSHIKAWA CONSTRUCTION)

[VI-492]Application results of smart deck renewal system that enables rapid construction

*Ichiro Fukuda1, Kazuhiro Utsugi1, Hiromichi Kobayashi1, Masatsugu Nakanishi1, Masaki Sadayama1, Akihito Hayabusa1, Takashi Kameda1, Kenta Okada2 (1. Kajima corporation, 2. East Nippon Expressway Company Limited)

[VI-493]Case Study of Deck Replacement that Adhered to Schedules while Mitigating Congestion Caused by Traffic Regulations
- Deck Replacement Project of Mimurosawa-Bashi Bridge on Kanetsu Expressway -

*Akira Sato1, Yuichi Matsui1, Takahiro Kameyama2, Atsuya Tanaka2 (1. TAISEI CORPORATION, 2. East Nippon Expressway Company Limited)

[VI-494]Rapid construction of invert using U-shaped retaining wall on an in-service expressway

*Naoki Sakai1, Yutaka Ogawa1, Sakai Junki1, Ryuichi Okada1, Ginpei Kanda1 (1. SUMITOMO MITSUI CONSTRUCTION CO.,LTD.)

[VI-495]Construction Report on Deck Replacement Using Half-Section Method While Maintaining Existing Lanes (Part 1) - Tohoku Expressway Adatara River Bridge Deck Replacement Project -

*Hiroaki Endo1, Katsyuyuki Miura1, Wataru Miyamoto1, Yoshihiro Kurakawa2, Ryuta Kitaguchi2, Kousuke Yamamoto2 (1. East Nippon Expressway Company Limited, 2. Penta-Ocean Construction Company Limited)

[VI-496]Construction Report on Deck Replacement Using Half-Section Method While Maintaining Existing Lanes (Part 2) -Tohoku Expressway Adatara River Bridge Deck Replacement Project-

*Yoshihiro Kurakawa1, Yoshifumi Ejiri1, Gen Hayashi1, Katsuyuki Miura2, Hiroaki Endo2, Wataru Miyamoto2 (1. PENTA-OCEAN CONSTRUCTION CO., LTD., 2. East Nippon Expressway Company Limited)