Session Details
山岳トンネル(覆工・吹付)(5)
Thu. Sep 11, 2025 4:50 PM - 6:10 PM JST
Thu. Sep 11, 2025 7:50 AM - 9:10 AM UTC
Thu. Sep 11, 2025 7:50 AM - 9:10 AM UTC
223
[VI-554]Report on an experiment on filling fresh concrete into the top of a lining concrete structure using a form vibrator
*masahiro Suzuki1, shinnya Tawaratsumida1 (1. TAISEI CORPORATION)
[VI-555]Verification of Workability through Simulated Experiments Using Full-Scale Precast Lining for Two-Lane Tunnels
*Shoichi Tateno1, Imamura Shingo1, Tatsumi Yoshitomo1, Dabaru Takehiro2, Taniguchi Tetsuhiro2, Genishi Daisuke3 (1. TODA CORPORATION, 2. GEOSTER Corporation, 3. MK-Engineering Corporation)
[VI-556]Development of an automatic casting system of the Lining Concrete and full-scale casting experiment
*Ryutaro Matsumoto1, Takahiro Saito1, Gokitani Naoko1, Rajib Kmar Biswas1 (1. OKUMURA CORPORATION)
[VI-557]Application Of Pre-Cast-Lining Method In The Small Tunnel Construction
*Keisuke Okatsu1, Kazuhiro Yamamori1 (1. Kumagai Gumi Co.,Ltd.)
[VI-558]Effect of adhesion prevention materials on uneven construction joints of tunnel lining concrete
*Kenji Akiyoshi1, Hideaki Nishiura1, Kuniaki Sakurai1, Yu Isaji1, Takumi Inada2, Nobuyasu Todoroki2 (1. OBAYASHI Corporation, 2. DAI NIPPON TORYO CO.,LTD)
[VI-559]Continuous monitoring system for the concrete hardens using TDR measurement technology
*Masao Uyama1, Kazumasa Koga1, Takashi Hitomi1, Toshihiro Sakaki2, Hirokazu Fujii3 (1. Obayashi corporation, 2. ESE Consulting LLC, 3. LAZOC Incorporated)