Session Details
データ連携とプロセス改革(1)
Fri. Sep 12, 2025 9:00 AM - 10:20 AM JST
Fri. Sep 12, 2025 12:00 AM - 1:20 AM UTC
Fri. Sep 12, 2025 12:00 AM - 1:20 AM UTC
3F D2
[CS17-01]BIM/CIM Initiatives at Model Offices on Expressways
*Tetsuya Yamazaki1 (1. Central Nippon Expressway Company Limited)
[CS17-02]A Study on the Creation of 3D Models in Design Work
*Risa Kai1, Atsunori Ishida1, Eiji Kodama1 (1. Central Nippon Expressway Company Limited)
[CS17-03]Development of front-loading technology by linking design data for steel bridges and utilizing 3D models
*Keiichi Yasuda1, Yukimasa Kamei1 (1. Office K1)
[CS17-04]Accuracy evaluation for repair inspection using 3D data
*Takashi Nakano1, Masaaki Uesaka1, Hiroya Eto1 (1. DataLabs, Inc.)
[CS17-05]Development of Automatic Drawing System for Composite Slab Panel Details and Stud Layout
*Takumi Hiroka1, Syunichi Katano1, Kentaro Amo1, Takumi Kakiichi1, Risa Aono2, Aya Akita2 (1. JFE Engineering Corporation, 2. IMG Limited Company)
[CS17-06]Labor-saving through the use of an AR rebar inspection system utilizing iPad Pro's LiDAR technology
*Noriaki Yokota1 (1. obayashi corporation)
[CS17-07]Study on Ensuring Traceability in Earthworks
*Yuki Kaburagi1, Hitoshi Ishida2, Shinji Fujita2, Katsumi Kikuchi2 (1. PENTA TECHNO SERVICE Co., Ltd., 2. PENTA-OCEAN CONSTRUCTION CO., LTD)