[VI-1044]Achievements of underground construction work considering the reduction of traffic impacts in narrow construction spaces.
*Kazuaki Higuchi1, Yasuhito Shikata1, Yasumitsu Takada2 (1. Maeda Corporation, 2. Japan Sewage Works Agency)
[VI-1045]Securing the processes in small-diameter shield construction during the excavation of boulders containing clay.
*Genki Kataoka1, Eito Miura1, Keiichi Kaneko1, Tomohisa Hoshi2 (1. TEPCO Power Grid,Incorporated, 2. OKUMURA CORPORATION)
[VI-1046]Construction of single shell lining for hydroelectric power station access tunnel
*Suguru Nakata1, Satoru Tokimoto1, Takahiro Sirai1, Fukuda Tsuyoshi1, Yamagishi Toshiyuki2, Yamashita Hironori2, Noto Takehito2 (1. Shimizu Corporation, 2. Hokuriku Electric Power Company)
[VI-1047]Challenges and Countermeasures for Girder Erection in Narrow Conditions Directly Above a Railroad Operating Line
*Takaya Onda1, Naoki Kuroda1, Kouzu Tosihisa1, Mitsuo Kanazawa1 (1. SHIMIZU CORPORATION)
[VI-1048]Efforts to reduce the impact on construction schedules through efficient inspections and attendance
*Yamato Yonemura1 (1. Central Nippon Highway Engineering Nagoya Company Limited)
[VI-1049]Study on the operation rate of offshore construction in coastal and offshore areas
*Hiroki Yasuda1, Hideyuki Sagishima1, Keishi Nishiyama1, Takashi Kumai1 (1. TODA CORPORATION)