[VI-1068]The problem of constructing top slab using half precast slab and its solution
*Naotoshi Hidaka1, Yusuke Hoshina1 (1. TAISEI CORPORATION)
[VI-1069]Construction method of large section precast box curvert dividing nine segments in narrow space
*Yuta Kawaguchi1, Yoshinori Mori2 (1. TAISEI CORPORATION, 2. Kyowa Concrete Industry CO.,Ltd)
[VI-1070]Design of a rectangular shaft for electric power with a large opening
*Minami Nakamura1, Yasuhiro Asa1, Yukihisa Miyaguchi1, Masahiro Akamatsu1, Kazuki Ogawa2, Makoto Kajiwara2 (1. TAISEI CORPORATION, 2. TEPCO Power Grid, Incorporated)