Presentation Information

[3D15]Effects of reducing radiation exposure through B-Li management at the end of the operation cycle of Ohi Nuclear Power Plant Units 3 and 4

*Kayo Notoya1, Mitsunori Hanabata1, Tomokazu Nakagawa1, Kei Joshua basukoro1 (1. KEPCO)

Keywords:

Pressurized water reactor,Reactor coolant system,Coolant cation tower,Ambient dose equivalent rate at the at the routine inspections,Radiation dose at the routine inspections,B-Li management

Password required to view


Comment

To browse or post comments, you must log in.Log in