Presentation Information

[1E05]Study to shorten the process of opening crude oil tanks
-Efforts to shorten the opening process-.

○YOSHINOBU HINOBORI1 (1. ENEOS Corporation Sendai Refinery Maintenance & Construction Group)

Keywords:

petrochemical,the guard basin,a construction method to remove sediments

With only one guard basin at the site, we devised a construction method to remove sediments while using the guard basin, and were able to shorten the draining process after the tank watering test by 30 days.