Presentation Information

[VI-1075]Example of excavation work with the self-supported earth retaining wall with stabilized body (part2 : Analytical verification)

*Yuta Kume1, Kouta Kanno1, Hiroyuki Aoyama2 (1. Kato Construction Co.,Ltd, 2. Asunaro Aoki Construction)
PDF DownloadDownload PDF

Keywords:

retaining wall,excavation work,stabilized,conventional method,ground analysis

Login required to view

Login is required to view some content.

Comment

To browse or post comments, you must log in.Log in