[VI-1074]Example of excavation work with the self-supported earth retaining wall with stabilized body(part1:Example of Construction)
*Tsubasa Takeuchi1, Hiroyuki Aoyama1, yuta kume2, Akira Tasaki2 (1. Asunaro Aoki construction, 2. Kato Construction)
[VI-1075]Example of excavation work with the self-supported earth retaining wall with stabilized body (part2 : Analytical verification)
*Yuta Kume1, Kouta Kanno1, Hiroyuki Aoyama2 (1. Kato Construction Co.,Ltd, 2. Asunaro Aoki Construction)
[VI-1076]Example of making a three-sided earth retaining wall self-supporting through ground improvement
*Kenji Murakami1, Yasuhiko Sato1, Takashi kataoka1 (1. Obayashi corporation)
[VI-1077]Innovative Case Study of Soil Improvement using Jet Grouting Method on Rubble Rock Layer
*Tatsuya Koge1, Masaru Hirano1, Shoma Ito1, Masafumi Nakao2 (1. Obayashi Corporation, 2. Kobe City)
[VI-1078]Case Study on the Installation and Lateral Movement Restraint of FFU Core Material in Trench Cutting Re-mixing Deep Wall Method (TRD Method)
*Kenta Hirai1, Yamagami Takayuki1, Noro Masashi1, Matsuzaki Tatsuya1, Kawakami Yukio1, Kato Hayate1, kusaba Syoma1, Sakamoto Hiroaki2 (1. KAJIMA CORPORATION, 2. SEKISUI CHEMICAL CO., LTD.)
[VI-1079]Rationalization methods and measurement examples for the design of circular soil-cement walls
Toru Yamashita1, Kaneyuki Takano1, *Shinnosuke Kuroda1 (1. OBAYASHI CORPORATION)
[VI-1080]Changes in groundwater level accompanied by embankment construction
*Hiroki Yamamoto1, Kobayashi Ryuuta1 (1. todacorporation)