土留め・造成 (1)

Fri. Sep 6, 2024 1:30 PM - 2:50 PM JST
Fri. Sep 6, 2024 4:30 AM - 5:50 AM UTC
B202(川内北キャンパス講義棟B棟)
Chair: Tsuyoshi Nakade

[VI-1074]Example of excavation work with the self-supported earth retaining wall with stabilized body(part1:Example of Construction)

*Tsubasa Takeuchi1, Hiroyuki Aoyama1, yuta kume2, Akira Tasaki2 (1. Asunaro Aoki construction, 2. Kato Construction)

[VI-1075]Example of excavation work with the self-supported earth retaining wall with stabilized body (part2 : Analytical verification)

*Yuta Kume1, Kouta Kanno1, Hiroyuki Aoyama2 (1. Kato Construction Co.,Ltd, 2. Asunaro Aoki Construction)

[VI-1076]Example of making a three-sided earth retaining wall self-supporting through ground improvement

*Kenji Murakami1, Yasuhiko Sato1, Takashi kataoka1 (1. Obayashi corporation)

[VI-1077]Innovative Case Study of Soil Improvement using Jet Grouting Method on Rubble Rock Layer

*Tatsuya Koge1, Masaru Hirano1, Shoma Ito1, Masafumi Nakao2 (1. Obayashi Corporation, 2. Kobe City)

[VI-1078]Case Study on the Installation and Lateral Movement Restraint of FFU Core Material in Trench Cutting Re-mixing Deep Wall Method (TRD Method)

*Kenta Hirai1, Yamagami Takayuki1, Noro Masashi1, Matsuzaki Tatsuya1, Kawakami Yukio1, Kato Hayate1, kusaba Syoma1, Sakamoto Hiroaki2 (1. KAJIMA CORPORATION, 2. SEKISUI CHEMICAL CO., LTD.)

[VI-1079]Rationalization methods and measurement examples for the design of circular soil-cement walls

Toru Yamashita1, Kaneyuki Takano1, *Shinnosuke Kuroda1 (1. OBAYASHI CORPORATION)

[VI-1080]Changes in groundwater level accompanied by embankment construction

*Hiroki Yamamoto1, Kobayashi Ryuuta1 (1. todacorporation)