Presentation Information

[VI-314]Plans for passage switching work associated with the construction of underground passages at Takebashi Station on the Tozai Line.

*Kaito Oyama1 (1. Tokyo Metro)
PDF DownloadDownload PDF

Keywords:

Passage switching work,steel temporary walkway,Water stop measures,Protection of underground objects,open cut method

Login required to view

Login is required to view some content.

Comment

To browse or post comments, you must log in.Log in