Session Details

地下構造物 (1)

Thu. Sep 5, 2024 9:30 AM - 10:50 AM JST
Thu. Sep 5, 2024 12:30 AM - 1:50 AM UTC
B200(川内北キャンパス講義棟B棟)
Chair: Kenta Tachibana

[VI-307]Design and construction records of the reinforced concrete structure at the joint between the power cable vertical shaft and the box culvert

*Minami Nakamura1, Yasuhiro Asa1, Rikito Izumo2, Taisei Sakai2 (1. TAISEI CORPORATION, 2. TEPCO Power Grid, Incorporated)

[VI-308]Securing Watertight Performance of RC Urban Ring Shaft by Design of the Opening Reinforced in the Shallow Ground

*Taisei Sakai1, Makoto Kajihara1, Rikito Izumo1, Yukihisa Miyaguchi2, Yasuhiro Asa2 (1. TEPCO Power Grid, Inc., 2. TAISEI CORPORATION)

[VI-310]Construction work of a new lower-slab due to Excavation of a lead-in shaft just belowthe operating line subway tunnel.
- Installation work of train turning line between Iidabashi and Kudanshita Station onthe Tokyo Metro Tozai Line -

*Keisuke Uchino1, Hase Atsushi1, Magotani Hirokazu2, Komoda Manabu2 (1. Tokyo Metro Co., Ltd., 2. PENTA-OCEAN CONSTRUCTION CO., LTD.)

[VI-311]Asahan River Diversion Work and Water filling Test for the Asahan No. 3 Hydroelectric Power Plant Construction

*Akira Tashiro1, Hideaki Kobayashi1, Takayuki Sakai1 (1. Shimizu corporation)

[VI-312]Impact Reduction Measures for Large Diameter Mud Type Pipe Jacking Method Directly Beneath Railroad Tracks

*Kohei Okuda1, Hirohumi Ikemoto1, Yukitomo Ishii1, Shota Nomoto1, Yusuke Mizomoto2, Takanori Seto2 (1. East Japan Railway Company, 2. OBAYASHI CORPORATION)

[VI-313]Example of Construction of Closed Face Pipe Jacking Method under Railway Embankment with Large Rock

*Masaki Takayama1, Hiroo Sone1, Mamoru Morohashi2, Kazuyuki Gotou3, Kazufumi Tsukada4 (1. TEKKEN CORPORATION, 2. RAITO KOGYO CO.,Ltd., 3. DAIEI CONSTRUCTION CORPORATION, 4. Shinano Railway)